Pulverizer machine is one of our main products. Let me share with you what work should be done before starting the pulverizer?
(1) After careful inspection to ensure that there are no bad phenomena in all parts of the pulverizer, and all parts are in a normal state, it can be started.
(2) Make sure to start the pulverizer under no load
(3) Advance notice must be given in the form of a signal when starting
(4) After starting, if any abnormal phenomenon is found, the operation should be terminated in time. It can be started only after cleaning up or finding out abnormal conditions (strictly start the grinder with abnormal conditions)
3. Do a good job of safe operation
(1) After starting, only when the pulverizer reaches normal operation, it is allowed to feed evenly and continuously.
(2) During the operation, the materials to be crushed must be put into the crushing cavity evenly, so as to prevent sideways participation or full charging, so as to avoid overloading and causing uneven discharge or unnecessary damage to parts.
(3) Pay attention to the speed of electromechanical, thresher, sound and bearing temperature during the operation. It should be ensured that under normal working conditions, the bearing temperature does not exceed 30 degrees, and the Zgao temperature cannot exceed 70 degrees. Once the above temperature is exceeded, it must be stopped immediately, the cause must be checked, and hidden dangers must be eliminated in time, and then the pneumatic motor can be used again.
(4) Before stopping, the feeding must be stopped first, and the motor can be turned off after the material filled in the crushing cavity is completely discharged.
(5) When crushing, if the material in the crushing cavity causes blockage and forms a parking phenomenon, it should be stopped immediately, and the material should be removed in time, and then restarted.
(6) If one end of the movable and fixed plate is worn, you can choose to turn around.
(7) When the crusher has been used for a certain period of time, the elbow sleeve should be tightened and re-tightened in time to prevent unnecessary damage to the machine due to the loosening of the tightened elbow sleeve.
(8) Once the following problems are found during operation, the engine should also be shut down in time for shutdown processing: (1) blockage; (2) smoke from the motor; (3) poor crushing quality.
4. Make sure the grinder is smooth
(1) Do a good job of wiping and smoothing the grinder to ensure the normal and orderly operation of the machine and prolong the service life of the machine and equipment.
(2) The lubricating grease used in the machine should be determined according to the location where the pulverizer is used and the environmental conditions, etc. In general, nano-based, calcium-based and calcium-uranium-based lubricating greases can be selected.
(3) The lubricating grease in the bearing seat should be about 50% of the volume of the space where it is located, and it is usually replaced every 3 to 6 months.
(4) Before starting the machine, an appropriate amount of lubricating grease should be injected between the bracket and the bracket.
In addition, the pulverizer will encounter various problems in its daily work. We need to analyze it carefully and do daily maintenance work, so as to improve the reliability of the pulverizer and improve the stable production of the enterprise. Do a good job in safeguarding.
Powder Grinding Mill is also one of our products, welcome to our website!